Your business name
Address, phone, email, license #
Estimate
No.
Date
Valid until
Customer
Job address
Scope of work
Upgrade the 100A service to a 200A panel, replace the meter base, move existing circuits to the new panel and schedule utility reconnect and inspection.
| Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
| 200A main breaker panel | each | |||
| Meter base | each | |||
| Circuit breaker | each | |||
| Service entrance cable | lin ft | |||
| Labor: panel upgrade | hour | |||
| Grounding electrode and clamp | each | |||
| Surge protector | each | |||
| Permit and inspection | each | |||
- Subtotal
- Tax
- Total
I approve this estimate and the scope of work above.
Customer signature
Date
